Testing controller/jogging on EMC2

More
15 Apr 2010 17:07 #2616 by eljainc
Hello,

I have a sherline 4000 lathe. It was running EMC and I had problems getting it to start up. I blew away
the old distro and set up EMC2 (Ubuntu 8.04 Jaunty). I went to run the system, but cannot get the system to jog/steppers to move. It is pre configured for a Sherline Lathe. Our system uses the parallel port controller sold by Sherline (4 axes).

I have the ESTOP turned off and am trying to manually home or move either X or Z axes and nothing.

What could the problem be? I have tried the original parallel port cable and even swapped it out for another, but no joy.

Mike

Please Log in or Create an account to join the conversation.

More
16 Apr 2010 03:25 #2617 by eljainc
I found out the problem. simple error on my part: The jog rate was defaulted to 0.003in/min which basically means nothing will move. I upped the rate to 2 in/min
and now it jogs normally.

Please Log in or Create an account to join the conversation.

Time to create page: 0.102 seconds
Powered by Kunena Forum