Hi, Apologies, did some more testing. If I start at ABS of Zero then Job axis 5mm at a time slowly (ie 100mm/min) every 3rd or 4th jog the counter will increment by .001 ie instead of reading 15.000 it will read 15.001, then if I keep joging it will then stay with the .001 until 35 then it will read 35.002.After some more testing here are my job results (jogging at 30mm/min and incr of 5mm)starts at ABS 0 G54=00->5->10->15->20->25.001->20->25.001->20->25.001->20->25.001->30.001...all .001 till 70.002jogging -ve from 70.002->65.001 ...all .001 til 25.000 .. all the way back to 0.000Feels like some sort of rounding / fp / devision error creaping inI have attached a HALShow screen - after joggin in cnrements of 5mm the first count was correct at 6400, then after a few it added an extra count then another at 30mm so now shows 30.001 as it must be rounding upHope this helps